The Ingolstadt–Kralupy–Litvínov pipeline (also known as IKL pipeline and MERO pipeline) is a crude oil pipeline in Central Europe. It facilitates the transport of crude oil from Germany to the Czech oil refineries of Kralupy and Litvínov. The name of the Ingolstadt–Kralupy–Litvínov pipeline is misleading, as the pipeline does not start in Ingolstadt and does not run to Kralupy and Litvínov.〔 == History == Negotiations to construct the Ingolstadt–Kralupy–Litvínov pipeline started in October 1990 and were concluded in 1992.〔 Originally, the pipeline was planned to run from Ingolstadt to Litvínov, but the route was changed to run from Vohburg to Nelahozeves. However, the original name of the pipeline was kept.〔 (【引用サイトリンク】 title= The IKL Crude Oil Pipeline ) 〕 Construction of the pipeline started on 1 September 1994 and was completed in December 2005. It was inaugurated on 13 March 1996.〔 It is the main pipeline in the Czech Republic allowing oil supplies other than those of Russian origin. In 2003, the pipeline was modernized by improving remote control systems and increasing capacity.〔 〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Ingolstadt–Kralupy–Litvínov pipeline」の詳細全文を読む スポンサード リンク
|